Shropshire Highways would like to make you aware that Site 214 B4386 Little Brockton to Brockton Urban is programmed to be surface dressed between 19th April and 29th May 2021.
The work is currently programmed to take place as follows: -
19th – 20th April - Road Closed from 09:30am to 16:00pm for Surface Dressing Prep Works.
9th – 11th May - Road Closed from 09:30am to 16:00pm for Surface Dressing.
The road will have an initial sweep within 24 hours of the new surface being laid. The sweeper returns after about 7 days to remove any residual loose chippings.
27th – 29th May – Road Closed from 09:30am to 16:00pm for white line replacement.
Gatemen will be on site to assist whilst works are taking place. Please liaise with site supervisor for access requirements.